In this system, after the implementation of the primer, rubber granules are mixed with resin and asphalt on a primed surface with a finisher for high-volume and manually dispersed with a special mold of thickness of 8 mm, and combined with a special tool and after 48 hours, the next layer of the mastic is applied to the surface. After this step, two layers of priming and surface trowelling are performed. In the next step, the self-leveling polyurethane is executed, and in the final layer, the anti-scratch layer is applied, the total thickness of the total flooring is 11mm according to the general standard.